Resource Center

⌘K
  1. Home
  2. /
  3. Docs
  4. /
  5. Resource Center
  6. /
  7. New Product Introduction ...
  8. /
  9. Customer Responsibilities...

Customer Responsibilities During NPI

During NPI the customer must stay reachable for real-time decisions, name a single technical and a single business contact, respond to DFM/DFT findings within 48 hours, and approve First Article results in writing before production is authorized.

  • Be available during pilot build for real-time decisions — don’t go dark
  • Designate a single technical point of contact (engineer) and business point of contact
  • Respond to Amtech DFM/DFT findings within 48 hours to avoid schedule slip
  • Approve or reject First Article results in writing before production is authorized
  • Provide reference boards or golden samples if available
  • Confirm test fixtures are ready before NPI build — don’t discover test coverage gaps during FAI

LET'S CONNECT

Fill Out The Information Below And An Amtech Team Member Will Be In Touch Shortly

What can we do for you?
The image shows the word AMTECH in white, with an orange arrow made of a circuit-like line extending from the letter H to the right, ending in several small dots.

© 2026 All Rights Reserved.

Your designs are confidential from first contact. Our Confidentiality Commitment · Sign our Mutual NDA · Send us your NDA