Resource Center

⌘K
  1. Home
  2. /
  3. Docs
  4. /
  5. Resource Center
  6. /
  7. Bill of Materials (BOM) B...
  8. /
  9. BOM Best Practices

BOM Best Practices

The BOM is the single source of truth for your assembly. A poorly structured or incomplete BOM is the most common cause of quoting errors, procurement delays, and build failures.

Required Fields (Non-Negotiable)

  • Reference Designator(s) — e.g., C1, C2, C5; or C1-C3 for a range
  • Manufacturer Part Number (MPN) — exact, full, no truncation
  • Manufacturer Name — spelled out fully (not abbreviations)
  • Component Description — e.g., ‘100nF 0402 X7R 10V 10% Cap’
  • Quantity per assembly
  • Package / Footprint — e.g., 0402, SOT-23, QFN-24

Strongly Recommended Fields

  • Approved Alternate MPN(s) — 1–2 qualified alternates reduces supply risk
  • Internal Customer Part Number — links to your design database
  • Do Not Populate (DNP) flag — explicit field, not hidden in notes
  • RoHS Compliance status per line item
  • Unit of Measure (each, feet, etc.)
  • Notes — any special handling, approved vendor restrictions, programmed device info

CRITICAL: If a component must be purchased from a specific vendor only (e.g., authorized distributor only, no gray market), state that explicitly in the Notes field. Amtech will comply but cannot assume restrictions not stated in writing.

LET'S CONNECT

Fill Out The Information Below And An Amtech Team Member Will Be In Touch Shortly

What can we do for you?
The image shows the word AMTECH in white, with an orange arrow made of a circuit-like line extending from the letter H to the right, ending in several small dots.

© 2026 All Rights Reserved.

Your designs are confidential from first contact. Our Confidentiality Commitment · Sign our Mutual NDA · Send us your NDA