- Turnkey means one partner handles parts, build and test.
- Parts and their lead time set most of your schedule.
- Send a clean BOM and files to get a fast, accurate quote.
You want boards built. You do not want to chase parts, track vendors or manage five handoffs. That is the case for turnkey PCB assembly. This guide shows what turnkey means, how it compares with other models, and what to send for a fast, accurate quote.

What turnkey PCB assembly means
Turnkey usually means one partner handles the full build. You send the design files and the bill of materials (BOM). The assembler does the rest. A typical turnkey scope covers:
- Buying the parts on your BOM
- Kitting and receiving parts
- SMT and through-hole assembly
- Inspection and test to an agreed plan
- Packing and shipping
Scopes differ between shops. Ask for the scope in writing before you compare prices.
Turnkey, consigned or partial
You can split the work in three common ways.
| Model | Who buys the parts | Best when | Watch for |
|---|---|---|---|
| Turnkey | Assembler | You want one owner for the whole build | Part substitutions. Approve them in advance. |
| Consigned | You | You hold stock or have special supply deals | Missing or short parts stop the build. |
| Partial turnkey | Both | You supply a few key parts, the assembler buys the rest | Clear lines on who orders what. |
What sets turnkey lead time
Parts set most of the schedule. Assembly time is short next to a long-lead part. At Amtech, prototype lead time is 1 to 3 weeks. Production starts from 1 week. Both depend on material lead time.
A BOM check up front shows long-lead parts before you commit to a date. Our guide to design for manufacturability shows what to fix early.
What to send for a turnkey quote
- BOM with manufacturer part numbers and quantities
- Gerber files and assembly drawings
- Build quantity, and how often you reorder
- Target dates for prototype and production
- Test needs, and any special handling or coating
- Your approved alternates, if any
A clean BOM gives the fastest, most accurate quote. Missing part numbers cause most delays.
Questions to ask any assembler
- Which certifications do you hold? Amtech holds ISO 9001, ISO 13485 and IPC-A-610.
- How do you handle a part that is out of stock or on long lead?
- Do you work in small volume and high mix, or do you push for large runs?
- What is your reflow process history? Amtech has about 15 years of vapor phase reflow with zero solder joint failures.
- Who is my contact when a question comes up mid-build?
How to get a first price
RapidRFQ gives quick-turn budgetary pricing. It is a fast way to plan. It is not production pricing. For a production quote, go to Let’s start and send your files.
Want to see how Amtech builds boards? Read about our PCB assembly and electronics assembly services.
Get pricing for your build
- RapidRFQ gives you quick-turn budgetary pricing. It is not production pricing.
- Tell us about your program and talk to the Amtech team.
Why Amtech
- About 15 years of vapor phase reflow.
- Family-owned for about 30 years, in Troy, Michigan.
- Certified to ISO 9001, ISO 13485 and IPC-A-610.